3 8d toe nails see notes in text above floor or ceiling joist to sill.
Proper blocking of walls to floor joists top plate.
Perhaps i should ask a separate question about that.
Cross bridging between joists.
Sill plates may be entirely eliminated where the top of a foundation of poured concrete fig.
2 8d into joists at each end of the block or bridging.
Or so short but the top plate needs to be cut to exact length again within 1 16 in because it establishes the building s dimension at the top of the walls.
The easiest way we ve found to fire block this spot is to butt a continuous 2x8 to the mudsill letting it overhang the foundation wall.
27b or concrete block fig.
Bottom wall plate or sole plate to floor joists rim joists or blocking exterior walls 2 82 400 mm o c.
Whether the plans call for blocking or a rim joist nailing the joists to the sill plate is the first step.
At the top where the plate attaches to the joists which means that by code fire blocking is needed.
Wall studs are then cut to fit in between the two.
Figure 27 anchoring floor system to poured concrete foundation wall.
Ceiling joist to top plate of wall.
When you go to frame a wall going parallel to those joists then you won t have anything to nail the top plate of the wall in to.
The top plate can be screwed directly to the joist when the.
3 8d into top plate.
Joists may bear directly on a solid concrete wall or on a top course of solid concrete block.
Stud to wall plate each end toe nail 63 4 or end nail 82 2 doubled studs at openings or studs at walls or wall intersections and corners 76 750 mm o c.
But the plate that sits on top of that the cap or double plate should be cut 1 4 in.
Since the rim joist is on its edge the builder uses an angled nailing.
The outside of the rim joist is flush with the stud wall beneath to ensure that the house boxing and siding will be even.
Doubled top wall plates 1 76 600 mm o c.
Rafter to top plate.
Blocking or bridging between joists rafters.
If your brain is about to explode now please stay calm i do have a picture.
We nail the 2x8 to the floor joists above then nail the 2x4 top plate of the basement wall to the 2x8.
The rim joist boards typically 2 by 10s or 2 by 12s install edgewise around the perimeter of the first floor top wall plate also called the tie plate.
There s a 1 gap between it and the wall making it hard to hammer into the joist hangers.
Not sure i understand the 24 48 grade you mention.
28b is sufficiently level and accurate.
The top plate is installed first then the bottom plate is anchored to the floor.
1 align one edge of a standing joist with the appropriate layout mark on the sill plate.
Rick dec 3 17 at 23 28.